It took a long time to fit Part 2S. Lots of trial and error cuts in the area where Part 2S overlaps Part 2R. Match drill Part 2S to the air inlet floor and to the left front side wall (Part 3). Looks good. Started fitting and trimming Part 1 (left bulkhead).