Enlarge to 7/16" the break line fluid fitting holes on the bottom of the fuselage (both sides). Enlarge to 7/16" the vent line holes on the forward bottom of the fuselage (both sides). Deburr holes and test fit. Prime inside of the External Step Tubes.