KitLog pro

Powered By Kitlog Pro v2.0

John B.s Web Site
' style=
Date:  10-19-2013
Number of Hours:  2.75
Manual Reference:  
Brief Description:  Work on main gear leg fairing

After transferring the template from the drafting paper copy to the gear leg fairings I cut the fairings to final size using the hacksaw. Although time consuming to achieve accuracy it went pretty easy. The fiberglass is quite thin for this part. Sand the cut edges and fit on the gear legs.
' style=

Fuse921

Fuse921

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.