KitLog pro

Powered By Kitlog Pro v2.0

Steves Web Site
' style=
Date:  5-23-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Load gyro onto trailer

I made two ramps from 2"x8"x12' for the main gear and used two 6' ramp for the nose gear.
I built a electric winch (from two broken ones) and used it to pull the gyro up the ramp with the help of Brian.

Afterwards, we created a better mount for the winch from angle iron and primed it.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.