KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  10-15-2015
Number of Hours:  6.00
Manual Reference:  Kit 2&3
Brief Description:  fiberglass work

I use Marbocote 227 as release agent, 5 layers to mold. Drying over night.
Mix epoxy NM275 and brush it inside mold. Already cut fiberglass 280g applied in 4 layers. As final layer I used peel ply, and work out the epoxy with a rubber sweegee.
Finally after cleaning up, I put a electrical heater inside cowling and installed top cowling, with clecos. To maintain the shape. About 30 degrees through the night and 45 degrees following day.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.