KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  11-1-2014
Number of Hours:  3.00
Manual Reference:  chapt 10
Brief Description:  main-gear left wheel

The same procedure as on right wheel. On left side I started with the two rim halves separatly, grind them carefully to make them slip on easy. Than installed tire, tube and bearings on axleshaft.
I will replace the 3 stainless steel bolts with standard 8.8 quality M8x70 . Threads on stainless steel bolts do not meet my requirements, unless they are silver plated.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.