Assembled grommet, heat shrink tubing and connectors on the trimmer cord. Continue with rivet the elevator hinge to stabilizer. But first I removed 6-T-1-50 from stabilizer, fabricated two 0,4 mm shim that lifted upper skin to a straight level. Cleaned up and moved the stabilizer into my storage room. Now it´s time for next step, the rudder.