KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  3-8-2014
Number of Hours:  2.00
Manual Reference:  chapt 3
Brief Description:  rivet upper elevator skin

Continued to assemble the elevator. Riveted 6-T-3-6 to 6-T-3-7 and place them into elevator, lowered the upper skin and installed cleco in all holes. Riveted 6-T-3-4E with 6-T-3-4mod and install with cleco.
Started from the middle to rivet upper skin with ribs, than 6-T-3-4E with 6-T-3-6 and 6-T-3-7. And doubler 6-T-3-10
Hard to remember not to rivet positions where hingles should be. And also two positions with extra long rivets.
In total there were 4 holes that did not match, had to drill new in ribs.
' style=

extra long rivet not installed yet

extra long rivet not installed yet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.