KitLog pro

Powered By Kitlog Pro v2.0

SVEN-AKE'S WEB SITE
' style=
Date:  2-24-2014
Number of Hours:  9.00
Manual Reference:  chapt 2
Brief Description:  assemble stabilizer

Friday-Monday. Finally riveted together all spars and ribs. Check that all parts are in right level with hingles and shims temporary installed.
Installed the trim tab wire after drilling holes in skin, front and rear spar. Since no grommets were found in my kit, I bought a universal grommet kit at a local store.
Deburred and primed inside of skin, and left it to dry.
Today, monday, I start with cleaning outside of skin from primer. Installed all clecoes again.
Tomorrow it's time to rivet the bottom of the stabilizer. Then there will be an inspection before the top is closed. I called my inspector today.
I'll see if I have time to put together the elevator before inspection.
' style=

leveling rear spar with hingles and ribs

leveling rear spar with hingles and ribs

' style=

checking ribs are level

checking ribs are level

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.