Started today's work by setting up my laptop to access the photo assembly manual from my office computer for quick, easy reference as I perform the assembly processes. Having the drawings and assembly guide close at hand helps prevent mistakes that often happen when working from memory or making bad assumptions.
Took trip to pick up tools (see today's second post). Time for this trip not in cluded in this post.
Clamped, drilled and clecod the center ribs to the spars. Drilled all holes to final sizes for the A4 and A5 rivets. Again, much of the time was spent double checking the layout and set up. The drilling and clecoing go relatively quick.