TODAY THE RUDDER PARTS WERE ASSEMBLED AND FITTMENT CHECKED. DISASSEMBLED RUDDER AND PREPARED THE STIFFNERS,AND LEFT AND RIGHT RUDDER SKINS.STIFFNERS CUT TO SIZE,AND MATCH DRILLED TO BOTH SKINS,DIMPLED AND FINAL CHECK OF FITTING.NEXT THE UNDER STRUCTURE WAS ATTACKED,ASSEMBLY OF THE UPPER AND LOWER RUDDER RIBS,COUNTER BALANCE RIBS,AND THE SPAR WERE MATCH DRILLED DEBURED,AND REASSEMBLED.FINALLY,THE SKINS WERE REFITTED TO THE UNDER STRUCTURE FOR A MATCH AND DRILL SESSION,ALONG WITH FINAL DRILLING AND A COUNTERSINK OF THE AEX WEDGE.