Powered By Kitlog Pro v2.0
Brocks RV-7A
RV-7A
Empennage
3-17-2012
< Previous Log Entry
Next Log Entry >
Date:
3-17-2012
Number of Hours:
2.00
Manual Reference:
Brief Description:
Drill Horizontal Stabalizer Rib Holes
Today, fluted HS-405 and drilled all holes. I then drilled all non-prepunched holes between the spar and skin. All holes were cleco'd to ensure proper fit. I then drilled al HS-404 ribs to the skin.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
148
610
Empennage
22
95
Fuselage
51
237
Miscellaneous
2
4
Shop Supplies
4
14
Wings
69
260
Copyright © 2001-2024 Matronics. All Rights Reserved.