Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Avionics
6-4-2013
< Previous Log Entry
Next Log Entry >
Date:
6-4-2013
Number of Hours:
4.00
Manual Reference:
Brief Description:
Panel Wiring Day #7
Grounded Dome lights / AOA switches /
Connected ELT gps feed/ ground/ power wires.
Finished Fuel pump power and swtich connections.
Finished Taxi light power to fuse block.
Worked on FFDM installation and wire routing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.