Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Avionics
4-8-2013
< Previous Log Entry
Next Log Entry >
Date:
4-8-2013
Number of Hours:
5.00
Manual Reference:
Brief Description:
Wiring Day #3
Added larger Adel clamps under panel to hold growing wire bundles.
Worked on routing wries along forward side panels.
Completed air vent valve controller wiring connections and ran 22awg wire for 12v power to switch.
Added extension for Elt "phone" cord and routed to switch.
Wired G3x screens and PMA 8000 lighting control wires to Lc-50. Added 6-conductor cable for connection to rheosatats.
Finished running Edc10 wire to left side of panel. Fabricated the D-10a connection harness and PC update cable.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.