Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Fuselage
2-23-2015
< Previous Log Entry
Next Log Entry >
Date:
2-23-2015
Number of Hours:
3.00
Manual Reference:
41
Brief Description:
Throttle Quadrant and panel work
Reinstall panel and checked final loaction of preheat switch and ignition switch.
Using loaner CT10-3, worked on modified mount and addtional sub-panel mount for cowl flap control and prop cycling control.
Verified rudder trim and TO/GA switch location- ready to cut.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.