Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Fuselage
8-12-2014
< Previous Log Entry
Next Log Entry >
Date:
8-12-2014
Number of Hours:
3.00
Manual Reference:
Brief Description:
Fuel system and tail wiring
Still working on repairing LDG light connector. Trying to find right tool to remove one molex pin that wire seperated off.
Tightened all fittings on aux transfer pumps, now ready for leak checks and flow timing.
Reinstalled fittings on main fuel tanks.
Botled VS in place. Drilled Strobe/Rudder trim wire pass thru.
Trimmed Vor/loc and strobe wire length and remaining location forlast adel clamp.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.