KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  8-12-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuel system and tail wiring

Still working on repairing LDG light connector. Trying to find right tool to remove one molex pin that wire seperated off.

Tightened all fittings on aux transfer pumps, now ready for leak checks and flow timing.

Reinstalled fittings on main fuel tanks.

Botled VS in place. Drilled Strobe/Rudder trim wire pass thru.

Trimmed Vor/loc and strobe wire length and remaining location forlast adel clamp.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.