Pulled plane outside to reinstall the left and right door struts. Ceiling wasn't high enough.
Then installed door rod blocks and adjusted openings to allow smooth operation of door locking mechanism. Installed the four door magnet sensors. Couldn't finish wiring as tools are at the hangar- Duh!