Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Fuselage
2-1-2014
< Previous Log Entry
Next Log Entry >
Date:
2-1-2014
Number of Hours:
4.50
Manual Reference:
Brief Description:
Body and fairing work
Spent the day sanding the HS tip fairings and the elevator tip fairings.
Continued working on adjusting the door openings on both doors.
I'm tired of DUST!!!!!!!
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.