KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-25-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Tanks and body work

Despite only being home for 24 hours for Christmas between a 6-day and 4-day work trip, I was able to slip away and finish inspecting the tank repairs. They look good, only a leak test will verify it. Drilled and deburred both tank repair plates.

Then spent time finish sanding the windshield fairing.
' style=

right tank

right tank

' style=

left tank

left tank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.