KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  3-26-2013
Number of Hours:  2.50
Manual Reference:  41
Brief Description:  Fwd Fuselage Installed

Clecoed the forward fuselage in place. Riveted the sup-panel sides to the fuselage bulkheads. Then riveted the forward fuselage ribs to the firewall. Finished by riveting the forward fueslage top skin to the fuslage structure. As with the rest of the fuselage structure, the rivets used were a .5 size larger as the called out rivets set a little small.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.