KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  3-3-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  GPU Doubler redo and Body work

With my wife's help, we reinstalled a new doubler for the Ground Power plug. Much stronger installation than the last one, which was probably adequate but I upgraded it anyway.

Then spent over an hour sanding body filler around door frames and cabin cover seam.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.