Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Fuselage
2-8-2013
< Previous Log Entry
Next Log Entry >
Date:
2-8-2013
Number of Hours:
2.50
Manual Reference:
37
Brief Description:
Fuel valve #3
Finished fabricating upper handle support bracket and drilled side tunnel attach holes.
Strated work on the Transponder and Ads-b antenna doublers. Cut piece of .063 aluminum and drilled holes tor cable and antenna bolts.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.