Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Fuselage
12-5-2012
< Previous Log Entry
Next Log Entry >
Date:
12-5-2012
Number of Hours:
4.00
Manual Reference:
Brief Description:
Interior and Electrical
Drilled forward interior side panel attach points.
Drilled additional 1/2" wire holes in F-1004D bulkheads and threaded Gtx-23 extension bundle down left side of fuselage.
Picked up 24 volt battery from ACS, so I can now finish fabricating battery box.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.