Continued work on center console. Drilled 2" hole in back for heat vent. Drilled holes for rear seat headsets. Cut Scat tube and test fit for forward heat and longer run to back seat heat "T". Cut piece of Scat tube for connection from lower "T" to center console heat vent. Assembled all pieces to test fit. Disassembled all parts.
Fabricated connection between forward and mid tunnel covers. Drilled/ deburred and dimpled parts.
Sprayed primer and filler on doors/ center console/ aft T heat/ and tunnel connection.