Riveted the hinges to the gear leg fairings. Drilled/C-sunk/riveted #8 nutplates to fairing brackets.
Installed aircraft steps.
Installed fairings to gear legs and installed wheel pants. Marked gear leg fairing per plans and adjusted postion. Located left lower intersection fairing, drilled and clecoed in postion.