KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-7-2011
Number of Hours:  4.00
Manual Reference:  45-4 thru 6
Brief Description:  Door Day #6 - Hinges and Door fitting

Installed LP4-3 rivets in door support doubler.

Rough trimmed both door window openings to 3/4" mark made in earlier step.

Rough trimmed both door's outer edge to with 1/8" of scribe line. Then continued trimming left door. Needs additional trimming before cutting location tabs.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.