Brief Description: Fwd Fuselage and Cabin Cover cont.
Completed riveting the forward fuselage.
Clamped cabin top to both door frames. Match drilled #30 the 25 rivets ahead of the F-1006 bulkhead. Cleaned out drilling dust. Continued drilling down left side and then forward along side skin to the left aft door frame.