Brief Description: Finished Baggage Door and Cont. Access panels
Sect. 31 Fluted and match drilled the two instrument panel attach flanges.
Sect. 33 Finished riveting the F-1028 baggage bulkhead channel in place at the bottom.
Sect. 34 Changed how baggage door hinge is attached to fuselage. Riveted K1000-6 nutplates to F-1058 hinge frame. Then riveted the hinge frame to fuselage per plans. Countersunk hinge for #6 screw and attached door to frame. Match drilled the F-1081 left baggage cover and deburred common holes. Installed insulation and then riveted F-1081 in place.
Sect. 35 Final drilled #19 all holes in all cover plates this section. Installed insulation in sidewalls at passengers seats.