KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-18-2011
Number of Hours:  3.00
Manual Reference:  33-7,8,9 and 35-3
Brief Description:  Baggage area assembly

Finished riveting baggage door seal channel and closeout cover in place. Riveted baggage floor angles to side skins.

Clecoed the right baggage cover in place and installed baggage bulkhead channel. Clecoed the tailcone top skin in place and secured baggage bulkhead corrugation via two screws. Match drilled #19 the left and center holes in bulkhead.

Match drilled #30 the right baggage cover to floor and longeron. Then match drilled #19 the right side of the baggage bulkhead. Final drilled #40 the nutplate holes in this piece.

Attached and match drilled the upper bulkhead corrugation. Removed both corrugated sections, top skin, and right baggage cover and deburred all accessible holes.

Installed inuslation under baggage cover and riveted part in place. Installed nutplates per plans.

Continued riveting nutplates along fwd left seat floor and center channel.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.