KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-14-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Floor closeout prep

Installed, match drilled and started riveting right passenger floor.

Checked antenna doublers to antenna for nutplate alignment. Two needed adjustment. Riveted doublers in place. Inserted battery cables inside one conduit. Added additional 3/8" conduit under passenger seat and baggage area. RTVed two conduits where they transited thru the baggage floor ribs.

Drilled 3/4" hole in bottom skins for step bolts.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.