Brief Description: Riveted Fuselage rib and step work
Finished riveting the forward fuselage rib in place. Then match drilled the two aft holes in step support block into baggage floor rib. Removed steps and, with bolts in place, match drilled remaining holes. Removed support blocks and deburred holes.
Then spent time rearranging the factory floor to allow room for the next big step. (see image #2)