KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-21-2010
Number of Hours:  3.00
Manual Reference:  29-22 and 30-3
Brief Description:  Riveted Fuselage rib and step work

Finished riveting the forward fuselage rib in place. Then match drilled the two aft holes in step support block into baggage floor rib. Removed steps and, with bolts in place, match drilled remaining holes. Removed support blocks and deburred holes.

Then spent time rearranging the factory floor to allow room for the next big step. (see image #2)
' style=

Tub almost done.

Tub almost done.

' style=

Here we grow again.

Here we grow again.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.