KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  10-7-2010
Number of Hours:  4.50
Manual Reference:  28-16 29-2,3
Brief Description:  Fabricate Longerons

Fabricated two shims from .063 stock for gear mounts. Final drilled #12 the mid seat rail holes in the gear mounts and drew reference lines on same per plans.

Cut the F-1046 R+L longerons from stock to length in plans. Using template, bent each longeron to shape and match drilled appropriate holes in each. Deburred both.

Cut the F-1013 L+R longerons from stock to lenght. Bent right to match shape of template, match drilled and twisted forward end 2 degrees outboard.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.