KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  1-16-2010
Number of Hours:  2.50
Manual Reference:  18-8
Brief Description:  Closed Left Fuel Tank

Step 1-3 (Repeated from right tank)

Finished adding sealant where needed on inside of tank. Laid thick bead of sealant at rivet line and in each corner, plus a very thin layer on each rib flange. Installed T-1002 tank baffle and put clecos in every hole. Applied pressure on all mating surfaces to set it in sealant. No pillowing that I could see.

Put tank Zees in place and attached using the AD-41H and AD-42H blind rivets, twirling in sealant before installing. Riveted end Zees in place with regular AD470 rivets.

Riveted T-1001 skin to T-1002 tank baffle. Injected additional tank sealant into each corner hole before setting it aside to cure.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.