KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-31-2009
Number of Hours:  3.50
Manual Reference:  18-5 and 18-6
Brief Description:  Tank assembly work

Step 8 Finished rivet repair on both tanks and riveted in right tank attach bracket.

18-6 Step 1,2,3 Cut, flaired, and assembled 1/4" Avgas vent line, 5/16" Jet-A flow-through vent system and 3/8" fuel return lines.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.