Brief Description: More tank ribs and finished match drilling skins
18-5 Step6 Installed outboard end rib in right tank- multiple rivets are too short in end rib. Once sealant has cured, will remove and replace. Then final seal all ribs. Installed first long rib in left tank.
20-5 Step 5 Right wing- finished match drilling right wing skins and removed clecos from both wing skins.
20-2 and 3 I am installing a Gretz Aero pitot tube mount and SafeAir1 pitot system lines and Dynon AOA lines instead of the Van's pitot installation. Finalized location for pitot tube mount and deburred mounting parts.