KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-2-2009
Number of Hours:  3.00
Manual Reference:  18-5 and 20-2+5
Brief Description:  More tank ribs and finished match drilling skins

18-5 Step6 Installed outboard end rib in right tank- multiple rivets are too
short in end rib. Once sealant has cured, will remove and
replace. Then final seal all ribs. Installed first long rib in left tank.


20-5 Step 5 Right wing- finished match drilling right wing skins and removed
clecos from both wing skins.


20-2 and 3 I am installing a Gretz Aero pitot tube mount and SafeAir1 pitot
system lines and Dynon AOA lines instead of the Van's
pitot installation. Finalized location for pitot tube mount
and deburred mounting parts.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.