Brief Description: Completed Right Rib Install and clecoed rear spar
14-5 Step 3 Riveted right wing ribs to spar. Installed An426 rivets on 14 holes under fuel tank skin.
14-6 Step 1 Installed hardware according to plans. Torqued same to 25 in/lbs.
need one AN3-16a bolt
15-4 Step 1 Clecoed the W-1007A rear spar, the W-1007B+C Rear spar doublers, the W- 1007D+E rear spar doublers and the W-1013 aileron attach brackets to both wings.