Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Wings
2-26-2009
< Previous Log Entry
Next Log Entry >
Date:
2-26-2009
Number of Hours:
1.75
Manual Reference:
13-3 thru 13-5
Brief Description:
Primed parts and assembled attached tie downs
13-3 step 8 Primed countersinks on spar flanges
13-4 step 10 Primed tie down brackets
13-5 step 1 Cleaned powder coating with #12 and 1/4" drill bits from aileron bellcrank mounts.
Attached tie downs and mounts to spars per plans.
Installed tie downs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.