KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  10-16-2014
Number of Hours:  3.00
Manual Reference:  18
Brief Description:  Left tank install

Drained all fuel from both main tanks that was used for leak testing.


Marked and rough trimmed right tank supply and return lines. Ready to send to TS Flightlines for fabrication.

Attached aux tank supply to left main tank and slid tank into place. Found interference betweeen vent fitting and spar edge. Removed tank and deburred spar to eliminate inteference. Primed spar and refit tank in place. Installed 23 bolts and 58 screws.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.