KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  10-10-2014
Number of Hours:  3.00
Manual Reference:  24
Brief Description:  Leak testing in progress and right tip.

Fueled both aux tanks with about 2 gallons each to leak check transfer pump fittings.

Fueled right maint tank with about 2 gallons and set on end to fluid leak check the aft bulkhead seams.

Sanded right wingtip and and microlight filler to start completion of aft tip repair.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.