Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Wings
7-14-2014
< Previous Log Entry
Next Log Entry >
Date:
7-14-2014
Number of Hours:
6.00
Manual Reference:
Brief Description:
Pitot and OAT probe wiring + more
Located and drilled Dynon OAT probe location in right wing. Connected probe wires to magnetometer.
Created Roll servo Dsub connector.
Located and drilled Garmin OAT probe in left wing near pitot tube. Connected controller wires
Worked finalizing Pitot probe lines and power routing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.