|
|
Flandy Rv-10
|
Date: 7-4-2014
|
Number of Hours: 8.50
|
Manual Reference: 44
|
Brief Description: Wing Assembly prep
|
|
Drilled, deburred, dimpled, and riveted the bottom two nutpleates on each fuel tank.
Drilled aft wing spar 3/16, 1/4, 5/16, and final drilled 3/8". Temporarily installed nut and bolt.
Drilled, deburred, and dimpled both bottom wing root fairings. Screwed in place and filed forward edge to match fuselage. Drilled #40 and #19 the remaining holes on fairing.
Fabricated fuel tank vents and installed snap bushing in bottom fairing.
Drilled, deburred, and dimpled top wing root fairing. Screwed in place and drilled #40 the remaining holes in fairing. Final drilled to #19.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |