KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  7-4-2014
Number of Hours:  8.50
Manual Reference:  44
Brief Description:  Wing Assembly prep

Drilled, deburred, dimpled, and riveted the bottom two nutpleates on each fuel tank.

Drilled aft wing spar 3/16, 1/4, 5/16, and final drilled 3/8". Temporarily installed nut and bolt.

Drilled, deburred, and dimpled both bottom wing root fairings. Screwed in place and filed forward edge to match fuselage. Drilled #40 and #19 the remaining holes on fairing.

Fabricated fuel tank vents and installed snap bushing in bottom fairing.

Drilled, deburred, and dimpled top wing root fairing. Screwed in place and drilled #40 the remaining holes in fairing. Final drilled to #19.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.