Started today by finishing aux fuel door installation in both wingtips. Installed strobe mounts and tested strobes. Needs final cosmetic work.
Stated prep work for wing installation. Beveled lower spar per plans. Mtach drilled #40 and #19 the wing fairing nutplate holes on lower skin. Deburred, dimpled and prepped nutplates for riveting.
Picked up parts from painter. Reinstalled hinges on right door and installed on fuselage. Installed door handle and center cam. Reinstalled baggage door.