KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-22-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Misc catch-up work

Spent the day working on multiple little projects that need priming before real progress is made.

1. Finished match drilling stiffeners to replacement top aileron skin. Deburred and ready to prime.

2.Finished riveting bellcrank to aileron pushrods.

3. Finished match drilling and deburring wing access panels. Ready to prime

4. Began working on Dynon pitot heat installation. Fabricated spacer and rib wire stand-off mount.
Now working on final placement.

5. Match drilled two VA-162 to two (long end) WD-1014 forward torque tubes. Deburred and
riveted in place. Repeated above porcedure to the short end of two WD-1014 torque tubes.
Then cut the WD-1014c torque tube collar in half.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.