KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  9-11-2008
Number of Hours:  1.00
Manual Reference:  10-17 to 10-18
Brief Description:  Frame and bulkhead assembly begins.

10-17

Step 4 Riveted bellcrank parts together.

Step 5 Riveted nutplates to battery/bellcrank mount.

Step 6 Snapped battery channels in place and riveted.

10-18

Step 1 Riveted F-1012A+B bulkheads, F-1056 rudder stop brace, and F-1012E tie down bar.

Step 2 Riveted F-1011 bulkhead, F-1011A stiffener, F-1011C HS attach brackets, F-1011E rudder cable angle.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.