Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
9-4-2008
< Previous Log Entry
Next Log Entry >
Date:
9-4-2008
Number of Hours:
2.00
Manual Reference:
10-16 and 10-17
Brief Description:
Dimpling complete. Battery mount and bellcrank as
10-16
Step 3 Completed dimpling skins.
Step 6 Seperated F1036 battery channel as show.
Step 7 Final drilled all holes in F1036B as shown and deburred all holes and edges.
Step 8 Final drilled #40, #30, #12, and #19 holes in F1035 battery/bellcrank mount.
Machine C'sink 3/32" the 20 nutplate holes.
10-17
Step 1 Seperated Bellcrank assembly parts.
Step 2 Clecoed bellcrank parts together and match drilled #30 common holes. Final drilled #12
the end holes. Deburred holes and edges.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.