KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  9-4-2008
Number of Hours:  2.00
Manual Reference:  10-16 and 10-17
Brief Description:  Dimpling complete. Battery mount and bellcrank as

10-16

Step 3 Completed dimpling skins.

Step 6 Seperated F1036 battery channel as show.

Step 7 Final drilled all holes in F1036B as shown and deburred all holes and edges.

Step 8 Final drilled #40, #30, #12, and #19 holes in F1035 battery/bellcrank mount.
Machine C'sink 3/32" the 20 nutplate holes.

10-17

Step 1 Seperated Bellcrank assembly parts.

Step 2 Clecoed bellcrank parts together and match drilled #30 common holes. Final drilled #12
the end holes. Deburred holes and edges.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.