Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
8-19-2008
< Previous Log Entry
Next Log Entry >
Date:
8-19-2008
Number of Hours:
1.50
Manual Reference:
10-14 and 10-15
Brief Description:
Shoulder harness anchor and cover plates
10-14
Step 1 Removed F1075 and F1074 top skins.
Step 2 Clamped shoulder harnes anchors in place. Need longer drill bit- to be completed later.
Step 4 Final drilled #28 the cover plate attachmet holes.
Step 5 Match drilled #40 the nutplate holes for cover plate.
10-15
Step 1 Marked the F1073R side skin triangle portion for removal.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.