Step 1+2 These two parts fabricated on CNC machine by Full Throttle Concepts.
Note- Rechecked placement of aft deck to longerons.
Step 3 Match drilled #30 the four holes from F1014 to F1011B spacer.
Step 4 Match drilled all side holes of aft deck #30. Then Final drilled #12 outboard holes of F1010A. Step 5 Final drilled the 7 holes of F1011B to appropriate size.
Step 6 Centered F1011D and clamped to F1011C HS attachment bracket. Match drilled #30 all holes. Outboard holes to be drilled #12 require longer drill bit- to be completed later
Step 7 Centered F1012D elevator stop even with aft deck cutout and clamped. Match drilled #30 with longeron holes drilled #12.