Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
7-27-2008
< Previous Log Entry
Next Log Entry >
Date:
7-27-2008
Number of Hours:
2.00
Manual Reference:
9-15 and 9-18
Brief Description:
C'balance wts. and Trim tab hinge
Step 8 Removed the material from the weights per the plans. Also removed the raised edge form on two of the weights.
Step 9 Installed weights to counterbalance with hardware per plans. Torgued to spec and sealed.
9-18
Step 1 cut hinge into to two 35 inch lengths
Step 2 Marked and drilled hinges per plans. Marked hinges with 1/4 inch line full length.
Step 3 Clecoed hinge to elevator and even hinge over length. Drilled end and middle and
clecoed. Then match drilled remaining holes.
Step 4 Repeated above step with trim tab.
Step 5 Marked inboard edge of control surface to hinge for timming.
Step 6 Removed hinge and pin. Trimmed hinge only to cut mark. Deburred same.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.