KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  7-22-2008
Number of Hours:  1.50
Manual Reference:  9-14
Brief Description:  Riveted Trailing Edge

Step 11 Removed weights and clecos. Hand spun #40 drill in each hole to clean out.

Step 12 Using same modified procedure from rudder construction, set double flush rivets on trailing edge of both elevators.

Very satisfied with outcome. Both look perfectly straight. At least I think so.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.