Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
7-22-2008
< Previous Log Entry
Next Log Entry >
Date:
7-22-2008
Number of Hours:
1.50
Manual Reference:
9-14
Brief Description:
Riveted Trailing Edge
Step 11 Removed weights and clecos. Hand spun #40 drill in each hole to clean out.
Step 12 Using same modified procedure from rudder construction, set double flush rivets on trailing edge of both elevators.
Very satisfied with outcome. Both look perfectly straight. At least I think so.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.