Brief Description: VS, Rudder, and pushrod installation
11-5
Step 5 Installed VS and match drilled/ final drilled/ c-sinked holes per plans. Installed hardware.
11-6
Step 1 Installed forward attach bolt for VS. Step 2 Bolted elevators in postion and checked for freedom of movement. Step 4 Riveted ends onto pushrod tube and set rod end bearings to intial length.
11-7
Step 5 Installed rod end bearings into rudder. Step 6 Installed rudder and adjusted rod end bearings for smooth operations. Tightened jam nuts. Step 7 Check for full travel. Step 8 Locked elevators in trail and measured rudder to elevator clearance. Adjusted rudder stop to achieve 2 3/16 clearance.